Infrastructure Building Design | Primary Substation 2012 Olympics | London | NORD Architecture
In 2007, NORD were appointed to work with EDF Energy and Olympic Development Agency to develop a strong contextual approach to a key utility building in the Olympic Park.
A number of structures are required to house infrastructure for both the 2012 Games and Legacy. The electricity substation was the first utility building to come forward for detailed planning permission and the design will influence other local utility buildings. NORD and EDF have worked closely with the Olympic Delivery Authority [ODA] to develop a scheme that is enduring.....more